What are the commonly used technologies for reforming coal-fired l t mhps boilers pvt ltds?
In order to promote the process of energy conservation and environmental protection, the national and regional governments have put forward many policies for retrofitting coal-fired boilers, hoping to speed up the transformation of enterprises using coal-fired boilers, and to make the soft sister boilers more energy-saving through various technical transformations. A more environmentally friendly purpose. So what are the more commonly used technologies for coal-fired boiler revamping? The following is a high-quality coal-fired boiler retrofit to introduce to everyone.
March 22 to 23, Ganzhou City, Jiangxi Province Bureau of Quality Supervision established party leadership team, the progress of the 2018 phase-out of coal-fired l t mhps boilers pvt ltds to conduct random work. Leading group led by Liu Ping, deputy director of Ganzhou City, Municipal Quality Supervision Bureau, the Municipal Industry and Information Commission, the Municipal Environmental Protection Bureau and the Municipal Development and Reform Commission composed of four departments jointly checks group within Xinfeng County of Ganzhou City, Nankang District, Jiangxi counties and carried out spot checks Yudu County coal-fired boilers working-out of a total of 17 companies.
Sampling results show that 17 companies, more than 10 companies to complete phase-out of coal-fired boilers, the other seven unfinished business executives also said that this year will be to complete the rectification work before December 20.
In this sampling event, checks the group also proposed rectification direction of the coal-fired boilers for local authorities: by strengthening the policy advocacy, strengthening inter-site inspectors guidance and strengthen departmental interaction, the three parties work together to ensure the timely completion of this non-compliance within Ganzhou coal-fired boiler out of the task.
Step l t mhps boilers pvt ltd blowdown boiler blowdown step 1, the total boiler periodically open the drain valve; 2, the first valve opening a boiler, and then slowly open the secondary valve; 3, after the boiler blowdown is completed, the secondary valve is closed first, after a closed valve; sewage should slowly, to prevent water impact, such as vibration occurs if the boiler tubes and other issues, should stop sewage, and check the cause, until the fault repair during sewage; 4, boiler blowdown process, such as boiler accident, should immediately stop sewage , but the drum level is too high and soft drinks were vacated, except; 5, boiler blowdown ban two boilers at the same time. Boiler water softening equipment raw water from the inlet into the control valve, the valve body through the valve body from the upper portion, by a top (or resin pipe outside the tank, below) into the tank. Then, down through the resin layer (this is a softening, the purge is a carbon layer or the like, the same below), becomes softened water return pipe by the water distributor, up to the valve body, the valve body from the softening equipment discharge outlet. Raw water softening equipment from the inlet into the control valve, the valve body into the inlet nozzle and the outlet nozzle flows quickly, a negative pressure, so that the salt brine tank inlet valve body from the suction port salt, into the tank top.
Boiler and l t mhps boilers pvt ltd shell consists of two main furnace and ensure accessories, ancillary equipment instrumentation, control and protection system safe and economic operation of its continuous constituted. This boiler is a boiler drum with a water cooling wall at about the subregional arrangements drum pyrotechnic two return pipe, before the folded portion of the drum front smoke box. Between the drum and the tank in connection with the downcomer tubes and water-cooled bi, constituting the frame of the combustion chamber. There upper steam separator drum to reduce the water vapor out of the tape. Pan heating surface of a lower portion of the drum, and the water cooling pipe bi pyrotechnic tube.
Get A Quote